翻译-整句英译汉 适中0.65 引用1 组卷98
Construction of the plant, with a capacity of 200,000 kilowatts, started in December 2012 by China Huaneng Group Co, Tsinghua University and China National Nuclear Corp. It was first linked to the power grid in December 2021. (英译汉)
2024高三上·全国·专题练习
类题推荐
组卷网是一个信息分享及获取的平台,不能确保所有知识产权权属清晰,如您发现相关试题侵犯您的合法权益,请联系组卷网