试题详情
语法填空-短文语填 0.65 引用1 组卷75
阅读下面材料,在空白处填入适当的内容(1个单词)或括号内单词的正确形式。

So far, construction work for the high-speed railway line linking Beijing and Zhangjiakou 【小题1】(complete).It is reported that the railway line can reach a top speed of up to 217mph(350km/h),which will be put into【小题2】(operate)by the end of the year.

The new line,【小题3】(build)in preparation for the 【小题4】(twenty-four)Winter Olympic Games in Beijing, has just entered service, reducing journey time between the capital and Zhangjiakou, which will stage most of the skiing events, from three hours to 47 minutes.

Zhangjiakou,【小题5】the north of Hebei province, will host snowboarding, freestyle skiing and ski jumping at the Games. Another major Olympic host on the new line is Yanqing,【小题6】skiing and luge(单雪橇)events will take place. Skating, ice-hockey and freestyle skiing will be held in the capital.

The trains will start and stop at stations automatically(自动地)to a precise timetable, and change speed 【小题7】(depend)on limits between stations. However, a monitoring driver will still be on board in case of emergencies.

Large storage 【小题8】(area)have been designed in the trains for athletes’ winter sports equipment. The carriages are equipped with 5G signals, intelligent lighting and 【小题9】variety of real-time safety sensors(传感器).This will 【小题10】(great)satisfy passengers’ need.

21-22高二上·湖南永州·期末
知识点:竞技/比赛交通方式5G技术 答案解析 【答案】很抱歉,登录后才可免费查看答案和解析!